whatsapp
KESKA engineering - home page




...

GROUND DATA REPORT

Geological and Geophysical Engineers, scientific data obtained from the processing of underground reports. Prepared by Geological and Geophysical Engineers in accordance with the principles.

get information

...

SOIL RESEARCH DRILLING

All kinds of art structures before the construction and project, drilling the ground with different methods, as a sample of rock and ground is to be reported.

get information

...

SEISMIC STUDIES

It is the process of measuring and measuring the ground from the earth with seismic devices and receiving and processing data from the depths of the ground.

get information


SERVICES


GROUND SURVEY

ZONING PLAN STUDY

STRUCTURE ANALYSIS

SEISMIC REFLECTION

RESISTIVITY - IP - SP

SOIL DRILLING

GEORADAR (GPR)

MICROTREMOR

ENGINEERING GEOLOGY

MARINE DRILLING

SLOPE STABILITY

MINING DRILLING

SETTLEMENT SUITABILITY

EARTHQUAKE RISK ANALYSIS

WATER SEARCH RESISTIVITY

GEOTECHNICAL PROJECT

GROUND DATA REPORT

GEOTECHNICAL REPORT

MULTI-ELECTRODE RESISTIVITY

MARINE SEISMIC AND BATHYMETER

HYDROGEOLOGICAL WATER SEARCH

PRESIOMETER MEASUREMENT

SEISMIC BREAKING - MASW

OTHER OPERATIONS

service-iconservice-iconservice-icon


Reference list    Presentation File

QUALITY AND TRUST


Thanks to our years of experience and experience, we are working to produce more satisfaction for our valued customers.

contact us



NEWS
...

First signatures were signed with the broadcloth factory

Kartepe's 174-year Çuha Fabrika-i Hümayun (Çuha Factory) Jeoradar tender was held. A contract was signed with the KESKA Soil Construction Laboratory and Engineering Company.Among the most important historical heritage of Kartepe ...

read more

...

First step at the train station

The first step was taken after the transfer of the historical station building, which has been neglected for years and left to rot, to the governorship of Kocaeli. Soil Survey, which is mandatory for the implementation of the project, was initiated by the winning company...

read more

...

Decide whether there is a fault or not

Through the middle of the town of Yeniköy to Gölcük Hisardere'ye 3-kilometer area before the fault was closed to zoning, then the fault was not found in the study.KESKA Soil Construction Laboratory and Engineering Company officials Şahin Keskin and his team ...

read more

...

There is no fault line under Yeniköy

Discussions on the area surrounding the Ford Otosan plant, which was allegedly on the fault line, were completely closed to reconstruction after the August 17 disaster. Kes-Ka experts connected to the company, the decision to close the zoning taken in relation to the region is unfair and wrong, there are no landslides or faults in this region claimed.

read more

CORPORATE REFERENCES










Go to top